Bexus 6/7 Launch Campaign

 

Bexus 6 successfully launched on 8th October 2008!

Beautiful picture during Bexus 6/7 Launch Campaign at: http://www.rymdstyrelsen.se/bexus_2008.shtml

More information about the Project History of the experiment

 

 

Bexus 6 comes back to Esrange  (10th October 2008)

On 10th October, Bexus 6 comes back to Esrange. The gondola was not damaged thanks to the soft landing and also our experiment was in perfect conditions.

    

 

 

  TOP

 

Bexus 6 recovery  (9th October 2008)

Bexus 6 was successfully recovered in Finland.

 

  TOP

 

Bexus 6 successfully launched  (8th October 2008)

On 8th October 2008, Bexus 6 was successfully launched from Esrange at 7:10 UTC. After a flight lasted about 3 hours, the balloon landed somewhere in Finland, just across the Finnish border.

   

 

 

  TOP

 

Bexus 6 launch rescheduled  (6th October 2008)

After two "Decision Meeting" held this morning (7:30 and 10:00), the launch of Bexus 6 has been rescheduled to Wed 8th October 2008 (early morning), due to bad weather condition. A launch rehearsal will be held today.  The next "Decision Meeting" will be Tue 7th October 2008 at 7:30 to discuss about a possible launch window on Tue 7th October 2008. However it is not likely to have the launch tomorrow as strong winds are expected.

 

  TOP

 

RF interference test  (5th October 2008, 15:00)

RF interference test with all the experiments and Bexus avionics switched on we did together with Esrange personell to check any interference between experiments and/or avionics.

 

  TOP

 

Experiment integration on the Bexus 6 gondola  (4th October 2008)

Esrange personell had already prepared our slot on the Bexus 6 gondola, making integration simple and straightforward.

 

  TOP

 

E-link telemetry test  (4th October 2008, 15:30)

Test of telemetry and telecommand of our experiment through E-link telemetry system.

 

  TOP

 

Magnetometers test on the launch field  (4th October 2008, 10:30)

Magnetometers testing in the middle of the magnetic anomaly of Kiruna! :)

 

  TOP

 

Long-run test  (3rd-4th October 2008)

The first test we have done once we arrived at Esrange has been a overnight long-run test to check all LowCoINS functionality. The next morning we have done a full memory dump and checked the telemetry recorded overnight.

  TOP

 