Sertum Web Page

  Here you can see the assembling of the upper ball bearing of the steering, the lower one was already be done, with insertion of the 25 new steel balls of 5 mm of gauge, with large use of grease. 

Here an other sight of the step of assembling of the upper ball bearing of the steering. 

Here you can see the two steering ball bearing mounted and also the upper fork bridge (chromed) and is possible to see very well the holes of the fixed tubes of fork and the clamping screws of the lower fork bridge.

  Here an other sight of the assembled steering.

Here you can see the assembling of the oscillating rear fork.

Here an other sight of the assembling of the rear fork. You can also see the suspensions, without the rings and the protection covers; the suspensions were already checked for the dumper cartridges and filled by hydraulic oil.