Here you can see the front
wheel mounted on the fork after the remount of the wire spokes on the hub and
the rim and the new tyre. Moreover you see on the right side of the handlebar (left
on the picture) the operating cables of the trottle , the hand lever of the
front brake and the ignition sparks anticipation lever.
Here you can see the same wheel from different sight and on the left side of
the handlebar (right on the picture) the operating cables of the hand lever of
the clutch and cold start choke
lever, moreover you see, on the hub of the wheel, the cable linking of
speedometer.
Here you can see the assembling
of the distributor and the sparks cables carrier.
Here you can see the assembling
of the rear wheel with the trasmition chain already mounted on the front and
the rear sprockets.
Here an other sigth of the front wheel.
Here youn can see the front
wheel with the front mudguard mounted.
Here an other sigth of the
front wheel with the front mudguard.
Here an other sigth of the front wheel with the front mudguard.
Here you can see the fuel tank and the cylinder head of the engine assembled.
Here you can see my wife Paola
(....the rear saddle!!!!) and my youngest son Andrea, that are went to check
the progress in
assembling works.....(snoopy!!!!)
Here you can see an other sight
of the fuel tank and the cylinder head of the engine.
...Please notes the temporary
assembly of the oldest left side exhaust pipe.
This is the overall sight of
the engine with all the componets assembed.