Sertum Web Page

  Here you can see the front wheel mounted on the fork after the remount of the wire spokes on the hub and the rim and the new tyre. Moreover you see on the right side of the handlebar (left on the picture) the operating cables of the trottle , the hand lever of the front brake  and the ignition sparks anticipation lever.

Here you can see the same wheel from different sight and on the left side of the handlebar (right on the picture) the operating cables of the hand lever of the clutch and cold start choke lever, moreover you see, on the hub of the wheel, the cable  linking of speedometer.

Here you can see the assembling of the distributor and the sparks cables carrier.

Here you can see the assembling of the rear wheel with the trasmition chain already mounted on the front and the rear sprockets.

Here an other sigth of the front wheel.

Here youn can see the front wheel with the front mudguard mounted.

Here an other sigth of the front wheel with the front mudguard.

Here an other sigth of the front wheel with the front mudguard.

Here you can see the fuel tank and the cylinder head of the engine assembled.

Here you can see my wife Paola (....the rear saddle!!!!) and my youngest son Andrea, that are went to check the progress in assembling works.....(snoopy!!!!)

Here you can see an other sight of the fuel tank and the cylinder head of the engine.

...Please notes the temporary assembly of the oldest left side exhaust pipe.

...an other sight.

...still an other sight

This is the overall sight of the engine with all the componets assembed.